A Stormwater Management Plan must be submitted for all applications proposing new buildings, and where alterations and additions to an existing building will result in a net increase of more than 50m²of hard surface area on a site (excluding land in Warriewood Valley Land Release Area). The plan must demonstrate:
- the direction of water flows on all surfaces,
- any existing or proposed water collections points/methods
- any existing or proposed water reuse systems
- any existing or proposed connections to Council’s stormwater infrastructure
- the size, location and design of any required on-site detention tank or basin
- the size, location and design of any required rain garden
- the size, location and design of any required rainwater tank
- existing and proposed impervious area and percentage change in existing and proposed impervious area
- consistency with any relevant BASIX recommendations.