Glossary

Glossary

94. Stormwater Drainage Assets Plan DA (NB)

If the property is burdened by a public stormwater drainage system or easement, compliance with the council controls must be demonstrated. Location, dimensioning and depth of pipelines and distance from the proposal’sfootings must be shown.

Additional plans and reports by a hydraulicengineer will need to be submitted if the proposal is seeking to modify, relocate, upgrade or remove a public drainage system.

Back to Glossary