Glossary

Glossary

35. Erosion and Sediment Control Plan CDC

Required where development proposes clearing or excavation of existing soil surface (including demolition, alterations/additions, or new development), stockpiling or landfill. Information to include:

  • plan at a scale of 1:100 or 1:200
  • location of appropriate sedimentation and erosion control measures, including but not limited to, sediment fences, all weather access points, gutter and stormwater pit protection measures, stock pile location, and dust control measures.
Back to Glossary